Load » Geotechnical Allowable Load
The maximum allowable load that may be transferred into a Helical Screw Pile Foundation as determined by the geotechnical properties of the soil. Usually determined by load test behavior or engineering analysis. ALg is typically limited to 50% of the Ultimate Geotechnical Capacity of the pile, but this may vary, depending on project parameters and other factors. |