Knowledge Base

Load » Proof Test

Load testing a Helical Screw Pile Foundation by applying loads in predetermined increments, maintaining each load for a period of time and recording deflection at the beginning and end of each increment. Engineers, to determine Allowable Load, often apply the results of proof tests.